Showing posts with label kitchen. Show all posts
Showing posts with label kitchen. Show all posts

Saturday, November 13, 2010

Office, Kitchen and Back Yard

Three areas, one update. First is the office. Finally after 2 1/2 years I've figured out a decent layout for the office.





It's kind of sad that it took so long, but at the same time it's great to finally have an office that I'm not embarrassed of. It's very minimal, and the only thing I can think of that would add anything would be a low bookshelf in the corner across from the desk; something maybe 3 feet high maybe.

Next the outdoors... a truckload of mulch came late Thursday afternoon that I got to move out to the back yard. Anyway this is what 10 cubic yards of mulch looks like. What you can't see is that it's about a car length from front to back. It took about 4 1/2hours to get it all back there. Needless to say I was tired the next day. Right now it's in smaller piles in the back yard waiting to be spread around where it belongs.



And the kitchen... the granite is in, everything is plumbed in and the backsplash is nearly up. It would be all the way up, but I didn't order enough. Hopefully it won't take long for another two sheets of the stuff to get here. Here's how it's coming out. This is all that's left to do in the kitchen so we're really close to the before / after post.







Tomorrow I'm going to work on the back yard and get back to work indoors on cleaning things up after it's dark out. We're nearly done with everything and it's been a long time working on all of this, but it'll all pay off soon.

Sunday, October 24, 2010

Kitchen Work and More

I've been spending a lot of time with the last few things in the kitchen left to do besides the obvious backsplash which can't happen until countertops are in. As of now it's basically done with only touch up paint and sealing the grout remaining.



We got some furniture for the dining room. It was a royal pain to put together, and shockingly enough wasn't made in China (but a country not too far from there). Holes from one piece to the next didn't line up very well. Here's how it came out.



The last really big challenge remaining indoors is to do something about the horrible upstairs bathroom. The wallpaper isn't great, but it's passable. The really bad part was the floor. Someone thought it would be a good idea to take up the linoleum but then must've gotten too scared to tile the floor so instead they got a bunch of u-stick-em tiles (pull the paper off the back and stick 'em to the floor). Those looked terrible and didn't stick to the floor very well at all.



So I decided to do the right thing and put real tile down. I'm not trying for anything fancy here. Just something that's neutral and would go with pretty much anything. Since it's upstairs I had to install some underlayment first. I decided to use 1/2" thick cement board (Perma Base) and it worked pretty well. To make a cut just score it and snap along where you cut. Then to install put thin set down first, then screw it in with 1 1/4" screws. It seems pretty solid. Anyway I'm done installing all the whole tiles and only have the ones that need to be cut next. I'll try and finish those tomorrow, then install the toilets and grout everything on Tuesday.



There's only one small problem but it has an easy solution - the toilets used to sit on linoleum, then junk tiles on the floor. Real tile sits about an inch higher. Luckily they make extensions for the closet flange that will make up the gap. Stick it on with silicone sealant and you're good to go.

So if you're ever going from linoleum to tile you'll need two easy things. An extension for the toilet drain (closet flange) and cement board as an underlayment. Then you're good to go!

Saturday, August 7, 2010

Finally some progress

We finally have some progress on the bathroom. The tile for the floor came in, and I was able to get an order of waterproofing membrane for the shower in - this time from a reliable distributor - and I'm back at work again.

This evening I laid out the whole pieces of stone. Luckily there were some straight line markings left over from the last tile floor this bathroom had, and I was able to use those to get the pattern straight. It's called a Versailles (aka headache) pattern. The stone is cut so that each of them meet with a butt joint. Grout lines will be really tight.

Enough talk, here are the pictures.




In other news... we got the order in for the cabinets and I'm ordering appliances tomorrow. We also have an order in for the bedroom furniture and will be placing another order with Basset for some random formal living room and dining room stuff tomorrow. Maybe a rug too... I'm not quite sold on the one we saw today yet. Kind of annoying because there's a big 20/30% off sale, but we have to place an order tomorrow because it ends then.

We're also almost done with the front / upstairs bedroom. It's painted, carpets cleaned and the furniture is moved in. Basically all it needs is a frame for this Shrek poster that I have and it'll be finished. Pics to come soon. The office is now a work in progress since all the bedroom stuff that was in there is gone, along with the giant bookshelf that was on the wall. It's really opened up the room, almost too much because now it looks really empty. Great view out the window now though from the new desk layout.

Friday, July 23, 2010

Kitchen Planning

Since I don't have tile, and I don't have moisture barrier and therefore can't work on anything in the bathroom (ugh) I've been spending some time getting things ready for the kitchen. So far we've figured out what to do with the walls and have it down to two candidates on the flooring. Both of us are leaning towards the striped one...







The reason a piece of flooring is in there with some of the pictures is because it'll sit next to the wood floor in a couple of places, and because it's really close to the color we're going with for the cabinets. The lines really pick up a lot of the blue and brown tones, which is a huge part of why we're leaning towards this option. We'll probably be looking at a granite that's silver in color and a backsplash that's a multi-color / multi-shape and size blue mosaic glass tile.

In bathroom news... it's looking like the flooring and travertine that I ordered way back when will be here on Monday so tomorrow I will be picking off the last few spots of mastic left here and there and checking one last time for level so we'll be ready to go when the stuff comes in. I'm hoping to have a test layout done the same day and to start installing the stuff Tuesday. The moisture barrier is supposed to get here soon. Apparently the place I ordered it from had a system failure on July 5th and all of their orders placed online were somehow never processed. Whatever, as long as the stuff gets here soon.

Sunday, June 14, 2009

May 2009

There's a lot to do right now because of the wedding coming up in 1 month, so I really haven't been all that busy. I decided to try cleaning up the grout in the kitchen and dining room again even though it really didn't do a lot last time. A few harsh chemicals made it a little whiter, but the floor was still a nasty concrete gray. Then I decided to grind into it a bit and sure enough it came up a bright white. After doing half the kitchen I remembered I had a can of white grout left over from the last house, and this was taking a long time. I'm sure you can tell where this is going...

It turns out that it's easier to just spread new grout than grind up the old stuff anyway. Enough of the old stuff has worn away so that the new grout is thick enough to stay around anyway. The difference is huge - I should've done this ages ago.


Snowy the Dog approves of this project.

I've also been busy running around trying to make the place more energy efficient. I was up in the attic above the garage for who knows what reason when I felt a draft of cool air coming up along a wall. Nothing a can of foam insulation can't take care of so I did that, and popped off every faceplate in the house to seal around those along with all the plumbing fixtures and lights I could get at. Anything that makes a hole in the sheetrock on the inside or the brick on the outside (excluding weep holes) was sealed up. It should have the added benefit of keeping bugs away.

I discovered as part of this that you're not supposed to run the furnace fan 24/7. Apparently that doesn't really circulate the air very much and also makes whatever drafts there are worse. The electricity bills should drop however much because they're not on all the time anymore. I'm almost looking forward to getting next month's electricity bill to see just how much lower it was this year vs. last year.
 
Locations of visitors to this page