Multi-room Update

I've been busy since the last post. In the kitchen, the cabinets hanging on the wall above the cooktop are in, and the microwave is installed and up and running. All the fun stuff that makes that work (electrical and venting) took ages to do and I've got the cuts from making the vent ducting to prove it. The laundry room is also more or less put back together. Still need to finish up with grouting and baseboards in there. I think I'm happiest about having the microwave in. It's coooool compared to the old one, and it took less than a week from when the old one went out to the new one going in.

In the bedroom, the update is that the furniture is finally in! Things are getting close to being done in there; I lack reworking the blinds, cleaning the carpet and getting something nice to hang on the wall. Also the mirror was damaged during shipping so we'll have to wait on that.

Tomorrow I plan on getting the drywall back in one piece and grouting underneath the refrigerator. I also want to get the small cabinet that goes above it in, and I think I'll get to work on the huge cabinet where the wall oven goes. I don't think it'll be that big of a challenge to get in, but the challenge will be... getting it in. It's taller than the doorway and weighs a ton. It's also upside down right now. Anyway that's tomorrow. Friday will be finishing up where I left off there, and doing floor cabinets. Kind of crazy to think about it but I'll be more or less done with my work in the kitchen before long. Probably within a week. I guess after that it'll be time to throw down some tile in the bathrooms upstairs and start working on smaller stuff.

The end is in sight. It may not be near, but I can see things start to finish up.

No comments:

Post a Comment

 
Locations of visitors to this page