I put down another 50lb thin set bag worth of tile this evening. Could've done more, but the two pieces going from the kitchen to the laundry room and pantry were really complex. Luckily I think those are the only nasty cuts. There's another doorway to deal with but I got lucky how everything comes together around it. Several small cuts on a bunch of tiles = good. Complex cuts on one tile = bad.
So anyway the informal dining room is done and the laundry room and pantry are getting there. The kitchen has all of two tiles in. The gameplan for tomorrow is, first do the kitchen minus the refrigerator and place where the dishwasher will go. Next, pull the washer and dryer out of the laundry room and do that + the pantry - the spot under the water softener. That should keep me busy most of the day. Those missing spots - I'll do those on Sunday and grout everything.
Sunday I'll be free to relocate the microwave plug and move the venting into the wall. It was a downdraft vent and took up a ton of space in the cabinet. Both of us hated it. Right now there's a 6in (or maybe 9?) inch pipe coming up from the foundation as the vent line going out but that shouldn't be hard to work with. Otherwise on Sunday I'm basically going to just do plaster and maybe if I'm lucky hang some overhead cabinets. Once those are in we'll be able to hook up the first of the new appliances, making it a grand total of 3 days that we used my brother's microwave from when he was in the dorm. Not bad.
By the end of next week I basically expect to be done minus the granite. Doesn't that sound familiar...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment